Sometimes I see things in my job that other people don’t see very often…
If you have ever done concrete work, you know there are a few basic steps to constructing a concrete slab. After the prep and formwork, the concrete is placed, and screeded. Then it is floated, and finally trowelled. Trowelling is usually done in several steps, depending on the finish desired.
Of these steps, screeding is probably the hardest part Continue reading “Ever seen a laser screed?”